from:China Electricity Councildate:2021-01-10
Recently, the cross-sea section of the 500 kV Yunpu I and II power transmission lines located at Meizhou Bay, Putian, Fujian Province has been shut down for comprehensive maintenance. This round of maintenance adopts such technical means as unmanned aerial vehicle, ultraviolet imager, and laser obstacle remover to improve the efficiency of grid inspection, lower the workload of inspectors, and reduce the operational risks. The picture shows an inspector walking on an overhead line for maintenance. (Photo by Shao Yuzi and Li Hongyu/ visual.people.cn)
Tel:+86-25-84152563
Fax:+86-25-52146294
Email:export@hbtianrui.com
Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)