China’s First Hydropower Station Integrated EDC Model Optimized on Dadu River

from:China Energy Investment Corporationdate:2022-03-21

China’s first large-scale cascaded hydropower station integrated economic dispatch control (EDC) model, the Pubugou-Shenxigou-Zhentouba hydropower station EDC of Dadu River Hydropower Development Co., Ltd. under China Energy Investment Corporation, introduced an integrated dispatch compensation service mechanism on March 15. Through expanding new scenarios and improving cascaded hydropower station intelligent dispatching, it helps optimize and enhance the hydropower stations’ profiting capacity.

China’s First Hydropower Station Integrated EDC Model Optimized on Dadu River-1

Shenxigou Hydropower Station

The EDC model achieves optimal real-time distribution of loads and water volumes among Pubugou, Shenxigou and Zhentouba hydropower stations, thus improving the usage efficiency of water resources, enhancing economic operating capacity, and increasing electricity generation. It plays a vital role in increasing energy transforming efficiency and optimizing the economic operating indexes of hydropower stations while significantly reducing the real-time dispatching and coordinating pressures.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Room 201-301, Building K10,15 Wanshou Road,Nanjing Area, China (Jiangsu) Pilot Free Trade Zone,Jiangsu Province,China (Zip Code:211899)

Thank you for your message. We will contact you as soon as possible!