China Energy Guangxi Branch’s First PV Project Begins Operation

from:China Energy Investment Corporationdate:2021-12-24

The first solar matrix of the coal-fired and photovoltaic integrated power generation project in Yongfu Power Plant under the Guangxi branch of China Energy was connected to the grid for operation on December 19, marking a “breakthrough” made by the power plant in photovoltaic power generation and a solid step taken by the Guangxi branch towards green, low-carbon energy development.

As the first photovoltaic power project planned and constructed by the Guangxi branch, it involves various forms of construction models including centralized ground photovoltaic power generation, rooftop distributed photovoltaic power generation, and parking lot and charging pile photovoltaic power generation. The project covers an area of more than 65 hectares, with an installed capacity of 45MV. After put into operation, it is expected to generate electricity of 44.85 million kWh each year, saving 14,000 tons of standard coal and reducing carbon emissions by 39,000 tons. Besides benefiting the environment, it will substantially optimize the local power supply structure and lay a solid foundation for creating a wind, photovoltaic, coal-fired, and hydrogen integrated energy base in Guangxi Zhuang Autonomous Region.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!