Baihetan dam: first penstock fully connected on its right bank

from:China Three Gorges Corporationdate:2019-12-02

Baihetan dam: first penstock fully connected on its right bank-1

Baihetan hydropower station, built and owned by China Three Gorges Corporation (CTG), announced that it has fully connected the first penstock of the catchment and power generation system its right bank on November 24 after the last section of the penstock of #15 diversion tunnel was hoisted, providing a solid foundation for the first batch of units to generate power in 2021.

The penstock is a key tube that connects water inlet with hydraulic turbine designed to channel water into the hydraulic turbine. The penstock of #15 diversion tunnel expected to enter concrete construction stage in December, with the remaining seven penstocks to be fully connected in January next year.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!