Changlongshan pumped storage power station completes general assembly of 1st power unit

from:China Three Gorges Corporationdate:2021-02-07

Changlongshan pumped storage power station completes general assembly of 1st power unit-1

CTG announced that its Changlongshan pumped storage power station has completed the installation of the No.1 power unit on February 3, a key milestone of the project.

The Changlongshan pumped storage power station, located in Zhejiang Province, has six 350-MW power units, with a rated waterhead of up to 710 meters, the largest in China and the second largest globally. The ultra-high waterhead, rotation speed and huge capacity make it one of the most complicated water complex equipment ever in the history of the world in terms of power unit design and engineering.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!