CTG puts 82 power units into full operation for the first time this year

from:China Three Gorges Corporationdate:2020-06-29

CTG puts 82 power units into full operation for the first time this year-1

China Three Gorges Corporation (CTG) put 82 power units into full operation in its four cascade hydropower stations along the Yangtze River on June 23, the first time in 2020, as part of its flood control efforts.

The total power output of all the 82 units at Three Gorges, Gezhouba, Xiluodu and Xiangjiaba hydropower stations reached 39.53 GW, providing an energy boost to national economic and social development.

Facing the challenging flood control situation this summer, CTG has been conducting joint operation of cascade reservoirs centered around the Three Gorges Reservoir, and making full use of flood control capacity for flood retention and storage as well as flood peak clipping and shifting, to ensure the safety of people's lives and property in the Yangtze River basin.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!