CTG installs China’s first large-diameter steel pile in Yangjiang offshore wind farm

from:China Three Gorges Corporationdate:2020-07-06

CTG installs China’s first large-diameter steel pile in Yangjiang offshore wind farm-1

China Three Gorges Renewables (Group) Co., the new energy arm of China Three Gorges Corporation (CTG), announced that it has installed China’s first large-diameter steel pile on June 23, marking a significant milestone at its Yangjiang Shapa offshore wind farm.

During phase two of a five-phase construction plan, CTG Renewables installed a steel pile for a four-pile jacket foundation that spans four meters in diameter and 40 meters in length with a gross weight of 190 tons. The installation represents a new technical breakthrough in the construction of large diameter pile jackets on Chinese offshore wind farms.

Located in Yangjiang, Guangdong province, the offshore wind farm has a total installed capacity of 1.7 million kW. It will install 62 wind turbines during the second phase, each with a capacity of 6.45 MW, amounting to 400 MW in total.

The large diameter four-pile jacket accounts for over 50 percent of the total capacity. Its installation marked a crucial step in connecting the phase two to the grid.

Contact Us

Tel:+86-25-84152563

Fax:+86-25-52146294

Email:export@hbtianrui.com

Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)

Thank you for your message. We will contact you as soon as possible!