from:China Energy Investment Corporationdate:2022-07-14
Generating unit of Jinjie Company’s Phase III expansion project.
The first of its kind in the world, the Phase III project, which adopts technologies of high-level layout of direct air-cooled turbo generators, has made a major technological breakthrough in the field. The “construction engineering design” evaluation program is aimed to accelerate the establishment of an eco-friendliness evaluation system for design, construction, and operation of engineering project, as initiated by the National Development and Reform Commission. Participating units must be new, expanded, or large-scale projects of technical upgrades that have independent production capacity and complete functions and adopt advanced concepts, methods and approaches in survey and design as well as new technologies that are applicable, safe, economical and reliable.
Tel:+86-25-84152563
Fax:+86-25-52146294
Email:export@hbtianrui.com
Address:Head Office: No.8 Chuangye Avenue, Economic Development Zone, Tianmen City, Hubei Province, China (Zip Code: 431700) Nanjing Office: Building 23, Baijiahu Science and Technology Industrial Park, No.2 Qingshuiting West Road, Jiangning Economic Development Zone, Nanjing City, Jiangsu Province,China (Zip Code:211106)